November 21, 2017
McGrath will work in two phases to replace an existing warehouse with a 33,000-square-foot warehouse/office building for U.S. Paint in downtown St. Louis while the manufacturing facility remains operational. During phase one of the $5 million design/build project, McGrath will erect a new pre-engineered metal building to provide new office space, a maintenance shop, a battery charging area and storage for raw materials. A connecting link will tie the new building into an existing manufacturing [...]
August 31, 2017
The newborn intensive care unit (NICU) within the Childbirth Center at Progress West Hospital in O’Fallon, Missouri, features eight newborn intensive care beds in a special care nursery with procedure room and baby nursery. Each bed includes state-of-the-art technology in a unique, family-centered layout with accommodations for an overnight guest. The space was completed with high-end finishes including brightly colored accent walls, glass-fronted maple supply cabinets, and frosted-glass and maple room dividers between the suites. [...]
June 27, 2017
This fast-track design-build project at Missouri Baptist Medical Center in St. Louis was completed in just six weeks. The project involved moving the hospital’s dialysis center to a new location in the main tower. McGrath installed a reverse osmosis water treatment system for dialysis procedures and oversaw the electrical, mechanical and plumbing portions of the project, which included bead-and-crevice-free fusion-joined PVC piping. Working in occupied health care areas, we implemented strict isolation and infection prevention [...]
June 26, 2017
The $4.8 million hybrid vascular operating room (OR) at Memorial Hospital Belleville in Belleville, Illinois incorporates advanced surgical, imaging and monitoring technology for cutting-edge, minimally invasive endovascular surgical procedures. McGrath combined two existing operating rooms to create the hybrid OR. We also coordinated with equipment vendors and managed the overall process to install the Siemens Artis Zeego robotic-arm imaging system, Storz monitoring equipment, and ceiling mounted OR equipment, anesthetic gases, monitors, X-ray shields and lights. [...]
March 15, 2017
The new $5.6 million St. Louis Heart and Vascular, developed by the Marcus Organization, is a high-tech ambulatory surgery center and medical office facility on McKelvey Road in Bridgeton, Missouri. McGrath installed a new exterior skin on the existing 21,000-square-foot two-story building, removed roof overhangs and raised the parapet walls to increase the building height. The interior of the facility was fully renovated with high-end wall and floor finishes, and a glass and stainless steel [...]