Montgomery Bank – Bridgeton

January 31, 2017

Montgomery Bank in Bridgeton, Missouri, contracted McGrath to construct a complete redesign of the branch with the addition of an AT&T retail store. The design-build project highlighted a trend in the banking industry to reduce branch size while incorporating a retail tenant into the original building footprint. Renovation of the 5,100-square-foot facility included exterior finishes and ACM panels, modern interior finishes, drive-thru lanes and canopy, new HVAC air handlers and utility services. McGrath completed the [...]

Read More

Affton HS Student Commons

December 9, 2014

The Affton High School Student Commons project included a two-phase building addition and renovation of an existing cafeteria.  Phase I involved constructing the new ground-up student commons building addition from February through May. During Phase 2, the new addition was tied into the existing cafeteria building and the cafeteria and dining area were completely renovated during the short summer break of June through August. Work Performed Construction Manager General Contractor Project Partners Christner, Inc. Commercial Division Page

Read More

Ameren-2014 Substations & Transmission Lines

March 12, 2015

McGrath & Associates, Inc. has been a partner to Ameren Services for over 20 years.  Completing hundreds of projects across Missouri, Illinois and Iowa.  In 2014, McGrath completed 47 unique projects, that totaled in size approximately $30,000,000.  These projects included expansion of existing substations, new substations, transmission line foundations and transmission line access work.  McGrath poured over 1580 concrete piers on these projects. McGrath self performed all the concrete work, including deep foundations, breaker pads, [...]

Read More

Ameren-Bland Substation

October 1, 2015

Ameren Missouri’s new $1.8 million Bland substation in Owensville, Missouri provided additional capacity for electrical distribution. The 5.5-acre expansion of the 345 kV substation work included 206 deep foundation piers and a new transformer pit. The rocky project site required substantial earthwork to prepare for construction. All of the excavated rock removed during grading was recycled as bank stabilization. Work Performed Civil/Site Contractor Energy & Industrial Division Page

Read More

Ameren-Cape Girardeau Transmission Line

March 12, 2015

This project involved replacement of wood pole power line structures along Cape Girardeau’s river wall with new steel poles.  This project was immediately adjacent to existing active rail lines. McGrath self-performed the deep foundations for the new transmission line.  Due to the proximately of the river, all foundations were installed utilizing a slurry method of construction.  McGrath coordinated all activities with the rail line, including daily mobilization of flaggers to the site.  Upon completion of [...]

Read More