July 8, 2019
This $1.3 million project was a unique 2,000-square-foot interior renovation within an existing building. An existing PD Lab office support space was converted to a Purification / Analytical Lab. Flexible lab space was the foundation of the design. Modular lab casework was utilized for ease of retrofit in the future. All lab utilities were fed from overhead. New dedicated roof top unit connected to existing central utility plant was provided. Work Performed Services: Construction Manager [...]
McGrath performed the design build installation of a new, $4.8 M, Validated GMP controlled warehouse over two phases. McGrath executed construction concept feasibility, schematic design through construction documents and execution of commissioning of a new 18,670 sf GMP warehouse and over all 31,612 sf total project space. The project involved new ADRM and Non-ADRM segregated sampling rooms. Validated Clean Cold Rooms and Freezers. New validated temperature monitoring was installed as well as new fire protection [...]
McGrath was the Design Build Construction Manager for the $4.5 million conversion of 85,000 sf of warehouse space to offices, production, R&D labs and headquarters and conference center. The new space will accommodate R&D Labs and offices, production space and a plastics lab. McGrath completed the design in house and is currently in the process of completing the construction. Work Performed Services: Design Build Construction Management Architect McGrath & Associates Value: $4.5 Million Architectural Division [...]
July 2, 2019
McGrath performed the design build installation of a temporary, $621K Validated GMP controlled warehouse. McGrath executed construction concept feasibility, schematic design through construction documents and execution of commissioning of the new 4500 sf GMP warehouse. This project entailed conversion of an existing office, conference room and cafeteria to the new GMP warehouse space. McGrath worked with the client to maximize the number pallets to be stored in the warehouse, while minimizing the footprint. Further, McGrath [...]
August 8, 2018
At SSM Health St. Louis University Hospital, McGrath renovated the 4,500-square-foot Infusion Center and Pharmacy, combining multiple areas into a single, larger space. The project included a new nurse's station, infusion bays and all new finishes. The pharmacy was in operation during the renovation so we completed construction over six phases to minimize disruption to staff and visitors. Our team implemented strict isolation and infection prevention measures to ensure a clean and safe environment. Work [...]